When an emergency repair had to be performed at a lift station, Keystone Pump & Power was called in to provide a temporary bypass. One of our silent pumps was used as a primary with a second unit set on a float switch for backup.


________________________________________________________________________________________________________________


During a recent lift station upgrade, Keystone Pump & Power provided a cost saving bypass system using Gorman-Rupp Electric End Suction Pumps. As electric power was readily available with a standby generator installed on site, we were able to save our customer thousands of dollars in fuel costs.


________________________________________________________________________________________________________________

Keystone was called in to dewater a bridge construction project. Our silenced, environmentally friendly pumps are well recieved along waterways. Our unique design contains all fluids to prevent spills. As an added feature, we use Terresolve oil in our mechanical seals. Should a seal fail, this oil is safe for the environment and requires no remediation.


________________________________________________________________________________________________________________

Keystone Pump & Power was called in to provide temporary pumps while a new spring was constructed. As the spring fed a trout farm, environmentally friendly pumps were a must.


________________________________________________________________________________________________________________

 

 

 

Long pipe runs through tricky terrain are no problem with our portable piping.


________________________________________________________________________________________________________________

 

 

Lone Star and the entire event were powered by Keystone Pump & Power for a local air show.


________________________________________________________________________________________________________________

 

 

 

 

Temporary pumps were set up to prevent flooding at a local manufacturer.


________________________________________________________________________________________________________________

Keystone Pump & Power's expertise was called in to handle a one day bypass so work could be performed on a wet well. Keystone supplied a turnkey system that pumped over 5 MGD with 25' of suction lift. Another satisfied customer!


This a job we did with Wexcon in Amity