This is the largest job we have done to date. We used over a mile of pipe to complete a well test.  We used a combination of Bauer Steel Pipe and HDPE pipe fused together.  A 300 kw genset was also utilized to power up our customers well pump.  Keystone Pump & Power provided  a Turnkey solution that included crossing under 3 roads and a railroad without disrupting traffic.


________________________________________________________________________________________________________________

This challenging well test required temporary piping through a mobile home park and across a heavily traveled road.  We were required to supply a turnkey solution without interrupting parking for the mobile home park residents and avoiding traffic control on the street.  Keystone Pump & Power used unique road crossing ramps to keep traffic flowing in the park and crossed under the road through a storm sewer to avoid traffic interuptions on the street.

Call Keystone to see how we can design your project!


________________________________________________________________________________________________________________

When the devastating tornado hit Campbellstown, Keystone Pump & Power was called in to assist with power and distribution for a remediation company.

Keystone Pump & Power can supply Power, Electrical Distribution, Dehumidification Equipment, Fueling Service and more.  All services are available 24/7.


________________________________________________________________________________________________________________

 

 

10" Pump and over 1000 feet of discharge pipe for well developing.


________________________________________________________________________________________________________________

 

Two 4" pumps with over 1200 feet of pipe for a sewer bypass used during a bridge replacement.


________________________________________________________________________________________________________________

Keystone Pump & Power was called in to pump over 10,000 G.P.M. to bypass a trout run at a hatchery. Two Gorman Rupp 10" pumps and one 4" pump were utilized.


________________________________________________________________________________________________________________

 

 

A 6" Gorman Rupp pump was used on this pump development test.


________________________________________________________________________________________________________________

After the hurricanes, Keystone provided a G 145 generator to power up a customer's submersible pump at a local quarry.


________________________________________________________________________________________________________________

When a local supplier could not provide enough pumping power capacity, Keystone Pump & Power was called in to make it happen. A 12" Gorman Rupp pump was used to complete a pipeline in Marysville.